RAP Power Check my eligibility
A Manila shop street at dusk under a tangle of overhead power cables

Choose who sells your business power.

Since 26 June 2026, sites using 100 kW, alone or pooled with neighbors, can switch supplier. We get you there.

For years, a business drawing under 500 kW had one place to buy electricity: its utility.

500 100 kW

The Energy Regulatory Commission lowered the bar for choosing a supplier. In force since 26 June 2026.

Under 100 on your own? The businesses next door count too.

Aerial view at dusk of a compound of six low-rise commercial buildings around a shared parking courtyard

Illustrative compound. Whether sites may pool is set by your utility’s rules for the area. We confirm it before anything is signed.

Pool the block.

Six small businesses. None qualifies alone. Watch what happens when they count together.

0 kW pooled

Captive. 100 kW to go.

Dotted mark: the ERC is studying a 50 kW threshold. Not in force.

Send this group to us

How the switch works.

Four steps, read like a one-line diagram. The wires and the utility that maintains them stay exactly as they are. What changes is who generates and sells you the power.

  1. Check

    We read twelve months of bills for every site, confirm each one’s peak demand and utility, and find out whether your sites can be counted as one group.

  2. Pool and meter

    The group’s intent goes to the utility, and the utility installs the advanced meters every participant in the competitive market needs.

  3. Compare

    We ask licensed Retail Electricity Suppliers for offers and set them side by side: rate, term, exit terms, renewable options. You choose, and you sign with the supplier directly.

  4. Switch and watch

    On the switching date your supply moves over. Afterwards we check every bill against the contract, and flag the kWh an energy audit could take off the top.

What we are

An independent advisor and channel partner to licensed suppliers, run by DOE-certified energy auditors.

What we are not

A supplier. We don’t sell you electricity and we are not a party to your supply contract.

Who pays us

The supplier you choose pays our fee. You pay no advisory fee, and we put that arrangement in writing before you sign.

Find your case.

A row of lit shops on a Manila street at dusk
Case
A row or compound of small shops
Pool by
Neighboring sites in one area, served by one utility
Typical
Bakeries, pharmacies, clinics, print shops, cafés
First check
Each site’s peak demand over twelve months
A six-storey mixed-use building with lit ground-floor tenants at dusk
Case
One building, many tenants
Pool by
A shared building and its meter room
Typical
Offices, dental and medical clinics, small bank branches
First check
Who owns and reads the meters
Light-industrial factory buildings with lit loading docks in an industrial estate
Case
Locators in an estate or ecozone
Pool by
Locators inside one estate’s distribution area
Typical
Light manufacturing, warehousing, food processing
First check
Whether the estate has its own distributor and local supplier
A standalone supermarket with rooftop refrigeration units at dusk
Case
One site already over 100 kW
Pool by
No pooling needed
Typical
Supermarkets, cold storage, schools, hospitals, small plants
First check
Twelve months of peak demand and the current contract

The market already moved.

142 end-users were scheduled to switch supplier on the first day of the 100 kW rule, 26 June 2026. Manila Bulletin

60 coffee shops of one chain in Metro Manila contracted a retail supplier together. BusinessWorld

11 MW of demand pooled by one water utility’s facilities under retail aggregation. Manila Bulletin

Your bill shows what you paid. An audit shows what you never needed to buy. We read both.

Engr. Jhonsen D. Sales, ECE

Founder, RAP Power

  • DOE Certified Energy Auditor
  • DOE Certified Energy Manager
  • AEMAS ASEAN Certified Energy Manager
  • 27+ energy audit engagements across Philippine industry and commerce
  • Author, The Energy Audit Handbook for the Philippines

Check my eligibility.

Tell us about your sites. We reply by email with what we need next, usually twelve months of bills, and whether pooling is possible where you are.

Your group

No sites added yet. Add them on the board , or just describe them in the form.

RAP Power

RAP Power website: pool sites past 100 kW and choose your electricity supplier. Inquiries go to the Lead table.